Project Overview
- Name: PASSO.
- Concept: A residential project focused on wellness, leisure, and connection, designed with meticulous attention to detail to integrate nature with architecture.
- Vision: Offers a beachfront living experience in its most refined form (Exclusive & Natural), where every element is designed to provide balance, comfort, and calm.
- Location
- The project is located on Crescent Road.
- It features a direct beachfront location, providing residents with private and direct access to the sand and sea.
- The units feature dual views: views of The Palm Jumeirah (The Palm View) and views of the city skyline (City Skyline View).
- Residential Units
The project consists of various categories distributed as follows:
Beach Mansions: Located on the lower floors (Lower Ground + Ground + 1st Floor).
- Lofts: Located on the second and third floors (consisting of 6 bedrooms).
- Residences: Distributed from the fourth to the ninth floor (consisting of 3 and 4 bedrooms).
- Penthouses: Located on the tenth floor (consisting of 5 bedrooms).
- Amenities
The amenities are designed to be part of daily life and include:
- Aquatic Areas: Experience Pool, Family Pool, Kids Pool, and Wet Lounges.
- Wellness Facilities: Wellness Pavilion and Spa.
- Social Facilities: Arrival Lounge and Library, Social Club, and Social Deck.
- Outdoor Spaces: Shaded gardens, Open Lawn, and Kids Pavilion.
- Roof Facilities: Sky Pool and Sky Garden.
- General Services: Private beach access and dedicated elevators for each sector (Core A & B).
- Key Features
- Design: The use of “The Glass Boxes” in the design with high ceilings to integrate the interior with the exterior.
- Privacy: Beaches reserved exclusively for residents and a limited number of apartments per floor.
- Experience: A luxury Arrival Experience and spacious terraces that wrap around the building’s corners.
- Payment Plan
- On Booking: 20% + 4% (DLD Registration Fees).
- During Construction (4 installments): 40% (divided into 10% approximately every 6 months).
- On Handover: 40% (expected in the second quarter of 2027).